Video Details:
Date: 2019/07/12 File Size: 9.67 MB
Duration: 00:00:06 Frame Size: 1920 x 1080

First robot installation for the new 500BEV line at Mirafiori


FCA installed the first robot of the future 500 electric assembly line in its historic plant of Mirafiori, in Turin, on July 11, 2019. The forecast is to produce 80,000 units a year, starting in the second quarter of 2020. The robots of the assembly line of the future 500 electric (new 500BEV ) inside its historic plant of Mirafiori, in Turin.

€ 399.00
€ 50.00

Latest Videos