Date: 2024/08/17 | File Size: 27.26 MB |
Duration: 00:00:50 | Frame Size: 1920 x 1080 |
A general view of the first voyage of the High-tech Dunhuang 100 MW molten salt tower solar thermal power station located on the Gobi Desert in Dunhuang, Gansu province, China, August 4, 2024. At this time, the heat-absorbing tower shines on the Gobi Desert, that is, more than 12,000 heliostats in the power station are transmitting heat on the 260-meter-high heat-absorbing tower around the concentric circle, and the strong light emitted by the heat-absorbing tower can be seen dozens of kilometers away. This project is China's currently built the largest scale, the highest heat-absorbing tower, can be 24 hours continuous generation of 100 megawatt molten salt tower solar thermal power station.